Services
I work with the people who own and operate buildings, and with the AECO teams who design, coordinate, and deliver them.
For owners and operators
-
Digital twin strategy and maturity assessment
Where you are, what level is worth paying for, and a roadmap to get there.
-
Asset data standards and BIM-to-FM handover
Requirements your design and construction partners can actually deliver against: naming, classification, required fields, and acceptance criteria at each milestone.
-
Existing-building data reconciliation
AI-assisted cross-referencing of drawings, CMMS, BIM, closeout data, and scans, producing a validated foundation and a specific field-verification list.
-
Reality capture program planning
Scoping scans and geolocated field audits so they answer operational questions, not just geometric ones.
-
Building internal capability
Standing up the team, governance, and workflows that keep the twin current after consultants leave.
For AECO teams
-
VDC program and coordination setup
Setting up coordination so it follows the physics: loading gates before clash resolution, a constraint tier hierarchy, weekly commit cycles that hold every trade accountable, and Navisworks workflows that feed the plan. The VDC Phase Tracker is a free tool built on the same approach.
-
Autodesk Forma and design technology initiatives
Deciding where Forma and other design tools fit your delivery process, piloting them on live work, and setting the templates, standards, and training that turn a trial into a practice.
-
BIM delivery standards and playbooks
Delivery playbooks that standardize BIM output regardless of who authored it, so models arrive consistent, coordinated, and ready for the owner’s next step.
-
Practical AI adoption
Choosing high-value use cases, running pilots, setting standards, and training teams to build and own their tools. AI used with intention: analytical work with clear quality criteria, not content generation.
Also open to the right owner-side leadership role in digital twin, digital facilities, or AEC technology.
Use the contact form and select “Full-time leadership role.”
Have a building, a portfolio, or a program that needs its data to agree?
Taking new engagements starting November 2026.